45SX200 & 60SX200
Hobart PowerMaster 45 & 60 kVA (208 / 230 V Input)
Item Number: 500048A-021, 500048A-022, 500048A-311, 500048A-312
DocumentsIllustrated Parts Lists
General Enclosure
ID | Description | Price | Edit | |
---|---|---|---|---|
|
2 |
286416-001
HANDLE,ACTUATOR,CIRCUIT BRKR
4 - 6 Weeks lead time
|
$580.15 | |
|
3 |
286411
BOARD,PC,CONTROL
2
In Stock
|
$2,595.46 | |
|
4 |
286398-002
PANEL,CONTROL,AY 11 KEY
4 - 6 Weeks lead time
|
$981.59 | |
|
10 |
402987
NAMEPLATE,HOBART
40
In Stock
|
$9.70 | |
|
15 |
287460
LABEL,DANGER HIGH VOLTAGE
(2 needed)
4 - 6 Weeks lead time
|
$7.69 | |
|
16 |
286441
LABEL,GENERAL IDENTIFICATION
(2 needed)
4 - 6 Weeks lead time
|
$0.00 | |
|
17 |
287341
HARNESS,WIRING,AY
4 - 6 Weeks lead time
|
$1,596.65 | |
|
19 |
286377
LABEL,FAULT CODES
4 - 6 Weeks lead time
|
$4.75 | |
|
20 |
286442
LABEL,RAINPROOF
4 - 6 Weeks lead time
|
$0.52 | |
|
21 |
282658
Label, WARNING KEEP 5 FEET CLEAR
(2 needed)
297
In Stock
|
$8.40 | |
|
24 |
286475-002
CHART,CABLE,ADV
3
In Stock
|
$220.44 |
Control Panel
ID | Description | Price | Edit | |
---|---|---|---|---|
|
5 |
82B1066-012
LIGHT,PILOT, AMBER
4 - 6 Weeks lead time
|
$121.21 | |
|
5A |
400613-004
LAMP,12-16V, #1815
51
In Stock
|
$9.85 | |
|
6 |
82B1066-001
LIGHT,PILOT,RED,12V.
4 - 6 Weeks lead time
|
$121.21 | |
|
6A |
400613-004
LAMP,12-16V, #1815
51
In Stock
|
$9.85 | |
|
7 |
82B1066-001
LIGHT,PILOT,RED,12V.
4 - 6 Weeks lead time
|
$121.21 | |
|
7A |
400613-004
LAMP,12-16V, #1815
51
In Stock
|
$9.85 |
Front Interior
ID | Description | Price | Edit | |
---|---|---|---|---|
|
1 |
280807
LABEL, GROUND
4 - 6 Weeks lead time
|
$0.00 | |
|
3 |
285315-001
SUPPRESSOR,M.O.V.
(3 needed)
3
In Stock
|
$152.00 | |
|
5 |
282653
TERMINAL, WIRE
(3 needed)
4 - 6 Weeks lead time
|
$9.76 | |
|
6 |
280966-001
CIRCUIT,BREAKER
4 - 6 Weeks lead time
|
$2,684.00 | |
|
6A |
286415-001
ACTUATOR,CIRCUIT BREAKER
4 - 6 Weeks lead time
|
$0.00 | |
|
10 |
404960-034
TRANSFORMER,CONTROL,400/452V
4 - 6 Weeks lead time
|
$1,046.64 | |
|
11 |
W10502-031
FUSE,SLOW-BLOW,15A,500V
4 - 6 Weeks lead time
|
$20.83 | |
|
13 |
281848-002
CAPACITOR, DC 1800 MFD
4 - 6 Weeks lead time
|
$38.80 | |
|
14 |
402682
SWITCH,TOGGLE,QUICK-CONNECT RPM
10
In Stock
|
$90.30 | |
|
17 |
181358
METER, RUNNING TIME
4 - 6 Weeks lead time
|
$161.81 | |
|
22 |
286445
Support, Door stop, Front
4 - 6 Weeks lead time
|
$54.00 |
Heat Sink Panel
Rear Interior
ID | Description | Price | Edit | |
---|---|---|---|---|
|
1 |
286480-001
TRANSFORMER,ISOLATION,90KVA
4 - 6 Weeks lead time
|
$5,853.13 | |
|
3 |
286492-001
INDUCTOR,AIR CORE,3 PHASE
4 - 6 Weeks lead time
|
$3,590.99 | |
|
4 |
493712
REACTOR,FILTER,AY
(2 needed)
4 - 6 Weeks lead time
|
$1,141.77 | |
|
10 |
280673
SWITCH,INTERLOCK,DOOR
4
In Stock
|
$106.10 | |
|
11 |
283066-002
BLOCK,TERMINAL
(3 needed)
1
In Stock
|
$152.25 | |
|
11A |
286380
LABEL,TERM. BLOCK CONNECTIONS
4 - 6 Weeks lead time
|
$3.08 | |
|
12 |
286392-001
BOARD,PC,I\O
8
In Stock
|
$2,839.84 | |
|
12A |
16DA4252-037
FUSE,1 AMP SLOW BLOWING
4 - 6 Weeks lead time
|
$5.99 | |
|
13 |
284316-002
SPACER,MALE-FEMALE,BRS,1.500L
(6 needed)
4 - 6 Weeks lead time
|
$17.40 | |
|
15 |
285102-001
TRANSFORMER,CURRENT
(4 needed)
4 - 6 Weeks lead time
|
$177.98 | |
|
15 |
285102-001
TRANSFORMER,CURRENT
(4 needed)
4 - 6 Weeks lead time
|
$177.98 | |
|
17 |
286531-001
RESISTOR,AY
(2 needed)
4 - 6 Weeks lead time
|
$0.00 |
Fan Assembly
ID | Description | Price | Edit | |
---|---|---|---|---|
|
1 |
283156-003
CAPACITOR,MOTOR START
3
In Stock
|
$129.68 | |
|
2 |
401911-005
BLOCK,TERMINAL,20A,5 POS
20
In Stock
|
$9.70 | |
|
2A |
400792-001
Terminal, Ring Tongue
(6 needed)
4 - 6 Weeks lead time
|
$0.59 | |
|
2B |
286486-001
CLIP,SNAP IN
(2 needed)
4 - 6 Weeks lead time
|
$4.43 | |
|
5 |
283155-003
IMPELLER,MOTORIZED
57
In Stock
|
$1,252.00 |
DC Capacitors
AC Capacitors
ID | Description | Price | Edit | |
---|---|---|---|---|
|
1 |
286389-002
CAPACITOR,PAPAE & FILM,21.0MFD
(12 needed)
10
In Stock
|
$177.03 | |
|
3 |
404033
INSULATOR,HEAT SINK,1-1/4"HIGH
(8 needed)
4 - 6 Weeks lead time
|
$2.27 | |
|
6 |
77A1107
LABEL,TERMINAL,A ADV,2ND O/PUT
4 - 6 Weeks lead time
|
$0.00 | |
|
7 |
77A1108
LABEL,TERMINAL,B
4 - 6 Weeks lead time
|
$0.00 | |
|
8 |
77A1109
LABEL,TERMINAL,C
4 - 6 Weeks lead time
|
$0.00 |
Contactors
Canopy Components
ID | Description | Price | Edit | |
---|---|---|---|---|
|
1 |
286518
Door, Rear
4 - 6 Weeks lead time
|
$193.40 | |
|
1A |
286485-001
GASKET,SEALING EMKA #1011-05
(11 needed)
4 - 6 Weeks lead time
|
$7.73 | |
|
2 |
286515
Support
4 - 6 Weeks lead time
|
$44.65 | |
|
4 |
286277
HINGE
4 - 6 Weeks lead time
|
$57.33 | |
|
5 |
286519
Canopy Top
4 - 6 Weeks lead time
|
$1,195.92 | |
|
7 |
286278
Hinge, Front Door SX
4 - 6 Weeks lead time
|
$56.74 | |
|
8 |
286498
Support, Front Door Stay
4 - 6 Weeks lead time
|
$106.17 | |
|
9 |
286517
Door,Front
4 - 6 Weeks lead time
|
$185.21 | |
|
9A |
286485-001
GASKET,SEALING EMKA #1011-05
(11 needed)
4 - 6 Weeks lead time
|
$7.73 | |
|
10 |
287542-001
LATCH,DOOR
(6 needed)
4
In Stock
|
$47.74 | |
|
10A |
288225
Gasket, Latch
(6 needed)
60
In Stock
|
$4.25 | |
|
11 |
287546-001
PAWL,DOOR LATCH
(6 needed)
4 - 6 Weeks lead time
|
$5.50 | |
|
12 |
284606-001
SUPPORT,DOOR
(2 needed)
4 - 6 Weeks lead time
|
$45.24 |
Bottom Components
ID | Description | Price | Edit | |
---|---|---|---|---|
|
1 |
286469
COVER,OUTPUT,RUBBER
4 - 6 Weeks lead time
|
$9.26 | |
|
2 |
286478
GUARD,CABLE,OUTPUT
4 - 6 Weeks lead time
|
$114.30 | |
|
3 |
283159-003
FILTER,AIR
4 - 6 Weeks lead time
|
$84.89 | |
|
4 |
286455
COVER,INLET AIR DUCT
4 - 6 Weeks lead time
|
$513.19 | |
|
4A |
283168-002
SCREW,CAPTIVE
(2 needed)
4 - 6 Weeks lead time
|
$12.50 | |
|
4B |
283171-002
Receptacle, Captive Screw
(2 needed)
4 - 6 Weeks lead time
|
$0.80 | |
|
4C |
283172-001
RETAINER,METAL
(4 needed)
4 - 6 Weeks lead time
|
$7.50 |