L-120 - Load Bank, 400HZ AC, 120KW

L-120

Load Bank, 400HZ AC, 120KW

6-8 Months Lead Time

The L-120 LOAD BANK is designed to provide a temporary load for field servicing and testing 400HZ 200VAC ground power units and power supplies. This load bank is air cooled and completely self contained. The unit can load three phase 200VAC up to 120KW in 7.5KW steps.