L-72 - Load Bank, 400HZ AC, 72KW

L-72

Load Bank, 400HZ AC, 72KW

6-8 Months Lead Time

The L-72 LOAD BANK is designed to provide a temporary load for field servicing and testing 400HZ 200VAC ground power units and power supplies. This load bank is air cooled and completely self contained. The load is selectable in 9KW steps from 0 to 72KW.