SC3000
26" Battery Powered, Rider Floor Scrubber
Item Number: 56381802-56381803
DocumentsIllustrated Parts Lists
Solution Tank
ID | Description | Price | Edit | |
---|---|---|---|---|
|
4 |
L08812457
CAP TANK LOCKING
(2 needed)
5 - 7 Days lead time
|
$7.00 | |
|
23 |
9096087000
CURVED ELBOW 90 M
(3 needed)
5 - 7 Days lead time
|
$7.00 | |
|
32 |
9098173000
VALVE 1/2-1/2
5 - 7 Days lead time
|
$20.10 | |
|
34 |
9098224000
MUFF FRESH WATER
5 - 7 Days lead time
|
$6.70 | |
|
39 |
9097626000
VALVE ELBOW KIT
5 - 7 Days lead time
|
$38.90 | |
|
K1 |
9098707000
COVER ELECTRIC COMPONENTS KIT
5 - 7 Days lead time
|
$32.40 | |
|
K2 |
9098709000
CAP SOLUTION KIT
5 - 7 Days lead time
|
$67.10 | |
|
K3 |
9098710000
LEVER BATTERY KIT
5 - 7 Days lead time
|
$33.00 | |
|
K4 |
9098711000
HW KIT SOLUTION TANK
5 - 7 Days lead time
|
$49.20 | |
|
27 |
9100000703
HOSE FILLING PKD
5 - 7 Days lead time
|
$46.62 |
Recovery Tank
Steering Column
ID | Description | Price | Edit | |
---|---|---|---|---|
|
15 |
9097805000
FOOTBOARD WITH COLUMN RAL
5 - 7 Days lead time
|
$384.90 | |
|
17 |
9097934000
PEDAL SPEED CONTROL
5 - 7 Days lead time
|
$408.20 | |
|
18 |
33005604
NUT HEX NYL LOC THIN M6
3-5 Days lead time
|
$6.90 | |
|
21 |
9097950000
FOOTREST
5 - 7 Days lead time
|
$6.70 | |
|
22 |
9097957000
SPRING FOOTREST
5 - 7 Days lead time
|
$6.70 | |
|
23 |
9099051000
LABELS KIT 26 DISC - 28 CYL.
5 - 7 Days lead time
|
$33.00 | |
|
2 |
1466530000
WASHER PLAIN 6X18 ISO7093 10 P
5 - 7 Days lead time
|
$33.70 |
Steering Wheel
Steering Support
ID | Description | Price | Edit | |
---|---|---|---|---|
|
4 |
1466146000
KEY 5X5X25 UNI6604A PKD
5 - 7 Days lead time
|
$43.93 | |
|
11 |
9097840000
SHAFT STEERING L.546MM
5 - 7 Days lead time
|
$29.60 | |
|
13 |
9099425000
STERRING TUBE KIT
5 - 7 Days lead time
|
$93.20 | |
|
15 |
9098094000
HARNESS STEERING WHEEL
5 - 7 Days lead time
|
$49.80 | |
|
18 |
1466319000
JOINT UNIVERSAL D.17 PKD
5 - 7 Days lead time
|
$89.40 | |
|
19A |
9098216000
BUSH FLANGED D.30X38X44
5 - 7 Days lead time
|
$6.70 | |
|
20A |
9098191000
HARNESS FOOT BOARD
5 - 7 Days lead time
|
$55.50 | |
|
K1 |
9098720000
HW KIT STEERING WHEEL SUPPORT
5 - 7 Days lead time
|
$60.20 |
Drive Wheel
ID | Description | Price | Edit | |
---|---|---|---|---|
|
15 |
9097807000
SPACER CROWN STEERING
5 - 7 Days lead time
|
$20.20 | |
|
17 |
9097834000
MOTOR WHEEL W300 24V
5 - 7 Days lead time
|
$2,167.80 | |
|
18 |
9097837000
STEERING BRACKET
5 - 7 Days lead time
|
$204.10 | |
|
19 |
9097841000
CROWN STEERING Z100
5 - 7 Days lead time
|
$38.90 | |
|
20 |
9098165000
PROTECTION DRIVE WHEEL WI
5 - 7 Days lead time
|
$6.70 | |
|
21 |
9098407000
WHEEL DRIVE
5 - 7 Days lead time
|
$234.70 | |
|
22 |
9098430000
HARNESS WHEEL MOTOR
5 - 7 Days lead time
|
$169.96 | |
|
23 |
1454691000
BEARING
5 - 7 Days lead time
|
$44.50 | |
|
24 |
9098625000
MOTOR ELECTRIC
5 - 7 Days lead time
|
$1,321.70 | |
|
25 |
9098627000
BRUSH CARBON KIT
5 - 7 Days lead time
|
$92.00 | |
|
30 |
9098626000
BRAKE ELECTRIC.RELEASED
5 - 7 Days lead time
|
$435.30 | |
|
31 |
9098800000
SEAL OIL
5 - 7 Days lead time
|
$37.70 | |
|
K1 |
9098721000
HW KIT DRIVE WHEEL
5 - 7 Days lead time
|
$32.40 |
Chassis
ID | Description | Price | Edit | |
---|---|---|---|---|
|
1 |
L08601574
KNOB M8 X 55
5 - 7 Days lead time
|
$12.18 | |
|
22 |
9096126000
BUZZER 5-32V
5 - 7 Days lead time
|
$34.80 | |
|
25 |
9098236000
HARNESS REAR MACHINE
5 - 7 Days lead time
|
$43.50 | |
|
27 |
9098390000
SUPPORT SQUEEGEE DOWN
5 - 7 Days lead time
|
$75.20 | |
|
30 |
9097798000
CHASSIS
5 - 7 Days lead time
|
$784.90 | |
|
32 |
9097816000
WHEEL REAR D.254 80SH GRE
(2 needed)
5 - 7 Days lead time
|
$169.40 | |
|
34 |
9097827000
SUPPORT SQUEEGEE UPPER
5 - 7 Days lead time
|
$84.50 | |
|
K1 |
9098722000
CENTRING SQUEEGEE KIT
5 - 7 Days lead time
|
$74.70 | |
|
K2 |
9098723000
FIXING WHEELS KIT
5 - 7 Days lead time
|
$19.80 | |
|
K3 |
9098724000
BRACKET TURNING KIT
5 - 7 Days lead time
|
$47.00 | |
|
K4 |
9098725000
HW KIT ROD EYE
5 - 7 Days lead time
|
$56.80 |
Solution System
EcoFlex Detergent System
ID | Description | Price | Edit | |
---|---|---|---|---|
|
4 |
9096903000
TANK CHEMICAL KIT
5 - 7 Days lead time
|
$88.50 | |
|
5 |
56315522
CHECK VALVE 1/8 BARB 125PSI
5 - 7 Days lead time
|
$10.90 | |
|
12 |
9096183000
PUMP CHEMICAL MIX
5 - 7 Days lead time
|
$502.17 | |
|
K1 |
9097818000
ECOFLEX KIT
5 - 7 Days lead time
|
$678.01 |
Squeegee Actuator
ID | Description | Price | Edit | |
---|---|---|---|---|
|
9 |
9097933000
CABLE SQUEEGEE LIFTING
5 - 7 Days lead time
|
$41.60 | |
|
11 |
9098248000
PULLEY D.30
(3 needed)
5 - 7 Days lead time
|
$6.70 | |
|
K1 |
9098708000
SQUEEGEE LIFTING KIT
5 - 7 Days lead time
|
$1,057.35 |
Squeegee
ID | Description | Price | Edit | |
---|---|---|---|---|
|
1 |
9096551000
KNOB M8X30 THD STUD SS
5 - 7 Days lead time
|
$12.18 | |
|
4 |
9097637000
SQUEEGEE FIXING KIT
1
In Stock
|
$30.87 | |
|
13 |
9096600000
DOWEL M8X30 SS
5 - 7 Days lead time
|
$11.66 | |
|
15 |
9098379000
WELDMENT SQUEEGEE TOOL
5 - 7 Days lead time
|
$189.60 | |
|
16 |
9098380000
STRAP FRONT SQUEEGEE 35
5 - 7 Days lead time
|
$37.70 | |
|
17 |
9098381000
STRAP SKIRT REAR RIGHT 35
5 - 7 Days lead time
|
$20.30 | |
|
18 |
9098382000
STRAP SKIRT REAR LEFT 35
5 - 7 Days lead time
|
$6.70 | |
|
19 |
9098729000
BLADES PU 890MM 35 KIT
5 - 7 Days lead time
|
$153.01 | |
|
K1 |
9098728000
SQUEEGEE CPL PU 890MM 35 KIT
5 - 7 Days lead time
|
$592.50 | |
|
K2 |
9096887000
ROLLER BUMPER KIT
(2 needed)
5 - 7 Days lead time
|
$244.24 | |
|
K3 |
9096394000
SQUEEGEE LATCH KIT
5 - 7 Days lead time
|
$77.49 |
Magic Deck (Disk)
Magic Deck (Cylindrical)
Brush Deck (Disk)
Brush Deck (Cylindrical) 1
Scrub Deck (Cylindrical) 2
Electrical Components
ID | Description | Price | Edit | |
---|---|---|---|---|
|
1 |
1458046000
FUSE HOLDER--
5 - 7 Days lead time
|
$28.94 | |
|
9 |
9097208000
SWITCH ELECTROMAGNETIC 24V
5 - 7 Days lead time
|
$92.60 | |
|
10 |
9099071000
CARD ELECTRONIC TRACTION EB1
5 - 7 Days lead time
|
$1,152.64 | |
|
12 |
9098190000
HARNESS EL.COMPON.BOX
5 - 7 Days lead time
|
$249.20 | |
|
13 |
9098897000
SENSOR PRESSURE KIT
5 - 7 Days lead time
|
$138.60 | |
|
14 |
1458368000
FUSE 3A--
5 - 7 Days lead time
|
$7.00 | |
|
15 |
1459853000
FUSE--15 AMP PANEL
5 - 7 Days lead time
|
$10.90 | |
|
17 |
1459854000
FUSE MTR DIFF--50A
5 - 7 Days lead time
|
$12.18 | |
|
19 |
9098762000
BATTERY CONNECTOR 120A RED
5 - 7 Days lead time
|
$65.69 | |
|
20 |
9098761000
BATTERY CONNECTOR 50A RED
5 - 7 Days lead time
|
$22.60 |
Battery Charger
ID | Description | Price | Edit | |
---|---|---|---|---|
|
13 |
9098677000
CABLE EXTENSION FOR CHARG US
5 - 7 Days lead time
|
$31.80 | |
|
K1 |
9098198000
BATTERY CHARGER KIT
5 - 7 Days lead time
|
$2,446.84 | |
|
9 |
9100000661
PLATE BATTERY CHARGER PKD
5 - 7 Days lead time
|
$50.80 | |
|
12 |
9100000653
CHARGER BATTERY 24V650W US KIT
5 - 7 Days lead time
|
$1,307.60 |
Accessories 1
ID | Description | Price | Edit | |
---|---|---|---|---|
|
K2 |
9098480000
BASKET KIT
5 - 7 Days lead time
|
$372.81 | |
|
17 |
9098250000
BASKET
5 - 7 Days lead time
|
$137.10 |
Accessories 2
ID | Description | Price | Edit | |
---|---|---|---|---|
|
K1 |
9098164000
FLASHING BEACON KIT
5 - 7 Days lead time
|
$529.06 | |
|
5 |
33023155
BEACON FLASHING PKD
5 - 7 Days lead time
|
$189.60 |